top of page

OUR EXPERTISE

Professional Compliance Services

Leading the way for a safe workplace with specialized testing, inspection, and certification services.

Pressure Vessel / Air Receiver Inspections

Comprehensive compliance inspections ensuring your equipment meets AS3788-2024 standards.

        External inspections required every 2 years

        Internal inspections required every 4 years

        Full vessel cleaning and data recording

        Ultrasonic wall thickness measurement

        Weld integrity checks

        Compliance certification issued upon completion

COMPLIANCE

AS3788-2024

Safety Relief Valve Testing & Certification

Onsite and offsite testing services to ensure your safety valves operate correctly when needed.

        Compliance with AS1271-2003 & ASME standards

        Minimising downtime with efficient testing

        Certificate of conformance issued for all tested                       valves

        Expert calibration and maintenance

        

        

COMPLIANCE

AS1271-2003 & ASME

Pipework Install/Maintenance

Custom piping solutions designed for efficiency and safety in industrial environments.

        Custom solutions tailored to your facility

        Fully compliant with Australian Standards

        Safe installation procedures strictly followed

        Routine maintenance to prevent leaks and pressure             drops

        Optimised system designs for maximum efficiency

        

COMPLIANCE

Australian Standards

Plant Registration (WorkSafe QLD)

Expert handling of WorkSafe QLD registrations for all qualifying pressure equipment.

        Registration required for Hazard Levels A, B, and C               (>14L)

        Mandatory yearly renewal before January 31st

        ART-AUS handles new plant registrations from start           to finish

        Ensuring legal compliance with WorkSafe QLD

        Documentation management and record keeping

        

COMPLIANCE

WorkSafe QLD

2-year check

External inspections of air receivers are required every 24 months to detect surface corrosion and structural issues.

Compliance Timeline

Staying ahead of your inspection schedule is critical for both safety and legal compliance.

4-year check

Comprehensive internal inspections must be conducted every 48 months, including ultrasonic thickness testing.

LEGAL REQUIREMENT WARNING

All pressure plant with a hazard level of A, B or C must be registered with WorkSafe. Failure to maintain current registration or inspection certificates can lead to significant fines and serious safety risks.

bottom of page