Pressure Vessel Inspections (External/Internal)

External: required every two (2) years from date of commissioning.
Internal: required every four (4) years from date of commissioning.

External inspection scope of work: 

Clean vessel, record all data information, check all welds/fittings for leaks, operational check of the safety relief valve and pressure gauge, check drain and whether vessel is bolted down. Record DNT measurements and issue compliance certificate to AS3788-2024.

 

Internal Inspection scope of work: 

Includes the above External Inspection with addition of isolating and de-pressurising the vessel, removal and replacement or test/certification of the safety relief valve. Access the vessel internally and view internal condition and welds, clean vessel if necessary and replacement of all gaskets/fittings used to access the vessel. Start compressor and record operating pressures.  

Pipework Installation

Compressed air pipework installations/adjustments.

Scope of Work: 

We understand every business is so unique and therefore each installation needs to be catered to those specific production needs - so we work closely with our customers from start-end, whilst maintaining safe working procedures and compliance to Australian Standards. 


The result is an efficient and streamlined compressed air system in your workplace, that is safe and effective. 

srv.jpg
ppe_edited.jpg

Safety relief valve testing and certification

Conformance to Australian Standard AS1271-2003 and the provisions of the ASME Boiler & Pressure Vessel Code Section VIII Division 1.

Scope of work:

We understand the importance of having plant that is utilised in a variety of ways operate as it should in the workplace - which is why we offer our safety relief valve testing and certification both onsite and offsite. 

​

We minimise downtime and increase confidence by testing and certifying a range of safety relief valves on site, which are then issued with a certificate of conformance. 

Plant Registration

All Pressure vessels/Air receivers rates hazard level A, B or C and greater than 14 litres and/or used in workplace environment are required to be registered with WorkSafe Queensland.

​

How often? 

All plant must be renewed yearly, prior to January 31st for any previously registered plant. 

​

All new plant registrations are mandatory from time of commissioning and are issued with a certificate of compliance upon registration. 

​

Where we come in: 

Our team collects vital data relevant to the plant when carrying out inspections for compliance purposes and so we have the ability to register plant on your companies behalf to reduce the time spent on admin tasks. 

​

For more information, refer to WorkSafe QLD. 